Mojo Forward
Forward deployed talent, inside your team, at every stage.
Forward deployed means senior people working inside your company, next to the consequences, and accountable for the result reaching production. A CTO for the mandate, an Architect for the system, an Engineer for the path to production.
Book a free 30-minute consult
A call with a MojoTech engineer, not a sales rep. No obligation; we follow up within one business day.
Where each role works
Pick a role on the lifecycle to see how it works.
The CTO owns the mandate, the Architect owns the system, the Engineer owns the path to production. Select a bar to see that role below.
Most clients start with one role; many add a second as the work moves along the lifecycle.
Mojo Forward · Forward Deployed Engineer
The thing you know you need, shipped to production in your repo.
MojoTech embeds a senior engineer inside your team for a 6–8 week sprint to build, integrate, and ship one production path, pairing with your engineers so they own it on day one.
Why now
Every week a pilot sits before production costs you the quarter you built it for.
The demo worked. The vendor signed. The spec is written. What stalls is the last mile: auth, data contracts, observability, the integration nobody owns, the edge cases the pilot skipped. A Forward Deployed Engineer owns that mile.
How the Engineer works
In your repo, not ours
Your tooling, your CI, your reviews, from day one.
Scoped to one production path
The narrowest slice that proves the integration end to end, then hardened.
Your engineers pair on every piece
Handoff is continuous, not a final week.
It is
One senior engineer inside your team
One production path with written acceptance criteria
Code in your repo from the first commit
A defined end
It is not
A seat on your team billed by the hour
A prototype that stops at the demo
A rewrite
An engineer who becomes the only person who understands it
What you get
Three phases, a defined end.
01 · 1 week
Inside and scoped
Access and environments set up, codebase and data read, a one-page sprint plan naming the production path and its acceptance criteria.
02 · 4–5 weeks
Build in production
Working software merged to your repo weekly behind feature flags, PRs reviewed by your engineers, a weekly written status.
03 · 1–2 weeks
Harden and hand off
Production rollout, monitoring and alerts, runbook, pairing sessions, and a handoff note with the next path.
Engagement options
Sprint · 6 weeks
One production path, documented sources, a chosen stack.
Extended · 8 weeks
Undocumented systems, two integrations, or heavier hardening: load, security review, live-traffic migration.
FAQ
Questions we hear about the Forward Deployed Engineer
Who owns the code?
You do, from the first commit. Everything is built in your repo under your license.
Is this staff augmentation?
No. A Forward Deployed Engineer owns a production outcome with written acceptance criteria, not a seat on your team. The sprint ends when the path is live and your engineers are running it.
How soon can you start?
The consult tells you the next available start.
Mojo Forward · Forward Deployed Architect
The system your roadmap needs, designed by building it with your team.
Proven in production, not on a diagram. MojoTech embeds a senior architect inside your engineering team to design the system an initiative needs, ship its first production path alongside your engineers, and leave the patterns and the people to carry it.
Why now
A roadmap stalled on a system costs more every quarter it waits.
Your team can produce code faster than it can judge whether the system will hold. So the AI pilot stays a demo, the platform stays half-migrated, and every estimate comes back as a rewrite. The architects you’ve met solve this with a diagram and a review board. The diagram doesn’t ship.
How the Architect works
In the team, not above it
Hands on the code, building alongside your engineers.
Proves the design in production
The narrowest path that resolves the biggest uncertainty, live.
Leaves the patterns and the people
Decision records and standards your team adopts by building with them.
It is
Senior architecture with hands on the code
A design proven by a production slice
Decision records your team can argue with
A defined end
It is not
A solutions architect who hands down diagrams
An agency that ships a prototype and leaves
Staff augmentation
A rewrite nobody asked for
What you get
Three phases, a defined end.
01 · Weeks 1–2
Inside
Code, data, incidents, and roadmap read; a design memo on what should exist and what to prove first; decision rights signed.
02 · Weeks 3–10
Build
The first production path built with a MojoTech team alongside your engineers; architecture decision records as decisions are made.
03 · Weeks 11–13
Transfer
Decision records complete, runbooks, pairing, handoff; the next phase scoped or exit.
Engagement options
Assessment · 2 weeks
The design memo and a scoped first path. The natural first purchase.
Phase · 90 days
The first production path live, your team shipping on it. 3–5 days a week embedded, with a MojoTech team sized to the scope.
FAQ
Questions we hear about the Forward Deployed Architect
How is this different from the architects we already have?
Yours are above the team, setting standards and reviewing. Ours is in the team, building the first production path and setting the patterns by shipping with them. Most clients keep their architects.
Who decides?
Decision rights are written in week one. The Architect decides architecture, interfaces, data contracts, and guardrails; your CTO decides scope, timeline, and ratification.
How soon can you start?
An Assessment typically starts within weeks; a Phase is scheduled from the Assessment.
Mojo Forward · Forward Deployed CTO
Senior technical leadership, embedded in your company, accountable for what ships.
Embedded, accountable, and time-boxed. MojoTech places a CTO inside your business to carry a technical mandate from the executive room to production, with an engineering team behind them, and leaves with a permanent leader in the chair.
Why now
A mandate without an owner costs a quarter before anyone notices.
You have the mandate, the budget, and the vendors. What you don’t have is a leader who can sit with the CEO on Monday, read the real data on Tuesday, and have working software in front of users by Friday. Advisors give opinions and agencies deliver scopes; neither owns the result.
How the CTO works
Embedded, not advisory
In your leadership meetings and your codebase most of the week.
Owns the outcome, not a workstream
Accountable for the mandate reaching production.
Leaves capability behind
A permanent leader hired or promoted, and an operating model that runs.
It is
Executive leadership with implementation proximity
Ownership from ambiguity to production
A team behind the leader
A defined end
It is not
A fractional CTO on retainer
Staff augmentation
A consultant who delivers a deck and leaves
A leader who becomes the only person who can move work
What you get
Three phases, a defined end.
01 · Weeks 1–2
Inside
The business, data, systems, team, and politics read; a scoping memo; operating cadence set with the CEO or board.
02 · Weeks 3–10
Build
The narrowest thing that resolves the biggest uncertainty, in production; technical direction, hiring plan, and vendor decisions owned.
03 · Weeks 11–13
Transfer
Permanent leader hired or promoted, operating model documented, handoff; next phase scoped or exit.
Engagement options
Assessment · 2 weeks
The scoping memo and a proposal. The natural first purchase for a board or operating partner.
Phase · 90 days
The mandate shipped, a leader in the chair. 2–4 days a week embedded, with a MojoTech team sized to the scope.
FAQ
Questions we hear about the Forward Deployed CTO
How is this different from a fractional CTO?
A fractional CTO advises a few hours a week and owns opinions. A Forward Deployed CTO is embedded most of the week, owns the outcome, and comes with an engineering team.
Why not just hire a CTO?
You should, and we’ll help. A Forward Deployed CTO covers the gap, writes the role from inside, and interviews the finalists.
What does it cost, and how soon can you start?
Priced per phase, not per hour, scoped after the consult or the Assessment. Start dates are confirmed on the consult.
The posture
Three roles, one posture: inside your team and accountable for what ships.
Embedded, not advisory
In your team, your codebase, and your meetings, not a review board above them.
Owns the outcome in production
Measured on what ships and runs, with written exit criteria.
Leaves capability behind
Your people run it after; nobody becomes a single point of failure.
Bring us the thing that’s stuck.
A free 30-minute consult with a MojoTech engineer. No obligation.